QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

GOLTICLAY WIND FARM NC ONLY REQUOTE

RWE RENEWABLES UK ONSHORE WIND LTD at MYBSTER

SSEN Embedded Capacity Register, May 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Jul 2026
Status
Accepted to connect
Customer
RWE RENEWABLES UK ONSHORE WIND LTD
Site name
GOLTICLAY WIND FARM NC ONLY REQUOTE
Address
GOLTICLAY WIND FARM, GOLTICLAY WIND FARM LYBSTER, WICK, CAITHNESS, KW3 6DA
Grid reference
Easting 324014, northing 937258
Licence area
North of Scotland (SHEPD)
Grid supply point
MYBSTER
Bulk supply point
Not stated
Primary substation
MYBSTER GRID
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 58 MW registered
Registered capacity
58 MW
Change to maximum export capacity
0.2 MW
Change to maximum import capacity
0.2 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
March 2025 edition

Change history

Tracked from the March 2025 edition to the May 2026 edition, across 15 editions.

Changes to its status, capacity, technology or customer, newest first.

  • June 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at MYBSTER

GSP view

19 other sites at this grid supply point in the September 2026 edition, 16 of them at MYBSTER GRID, the same primary substation. In all, the sites here total 506 MW: 191 MW connected, 315 MW accepted to connect.

See all 19

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose