GLENLYON

INVERVAR HYDRO DEVELOPMENT LIMITED at KILLIN

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
28 Oct 2015
Status
Connected
Customer
INVERVAR HYDRO DEVELOPMENT LIMITED
Site name
GLENLYON
Address
INVERVAR HYDRO, ABERFELDY, PERTHSHIRE, PH15 2PP
Grid reference
Easting 258171, northing 747124
Licence area
North of Scotland (SHEPD)
Grid supply point
KILLIN
Bulk supply point
Not stated
Primary substation
KILLIN GRID
Connection voltage
33 kV
Technology group
Hydro and marine
Energy source 1
WATER, HYDRO - OTHER: 1.2 MW registered
Registered capacity
1.2 MW
Maximum export capacity
1.2 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700052856460
Import MPAN
1700052856451
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at KILLIN

GSP view

5 other sites at this grid supply point in the November 2026 edition, 4 of them at KILLIN GRID, the same primary substation. In all, the sites here total 104 MW: 6 MW connected, 98 MW accepted to connect.

  • MORENISHOPDE UK LIMITED, Storage, KILLIN GRID primaryAccepted49.4 MW
  • BORELAND ENERGY STORAGE PARKNEW ENGLAND LOBSTERS INTERNATIONAL LIMITED, Storage, KILLIN GRID primaryAccepted48 MW
  • ACHOMER ENERGY LTDACHOMER ENERGY LTD, Hydro and marine, KILLIN GRID primaryConnected1.9 MW
  • LAIRIG A MHUIC LLPLAIRIG A MHUIC LLP, Hydro and marine, KILLIN GRID primaryConnected1.14 MW
  • GLEN DOCHARTCHAORACH HYDRO, Hydro and marine, CHAORACH primaryConnected2 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?