GARBET WIND FARM
ENERGYFARM UK GARBET LLP at KEITH
SSEN Embedded Capacity Register, May 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Nov 2025
- Status
- Accepted to connect
- Customer
- ENERGYFARM UK GARBET LLP
- Site name
- GARBET WIND FARM
- Address
- GARBET WIND FARM, GARBET WIND FARM, KEITH, ABERDEENSHIRE, AB54 4YD
- Grid reference
- Easting 342509, northing 838453
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- KEITH
- Bulk supply point
- Not stated
- Primary substation
- KEITH GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 46.2 MW registered
- Registered capacity
- 46.2 MW
- Change to maximum export capacity
- 0.25 MW
- Change to maximum import capacity
- 0.25 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2025 edition
Change history
Tracked from the September 2025 edition to the May 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
- June 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
- May 2026 editionExport capacity changed from 46.2 MW to 0.25 MW
- November 2025 editionTarget energisation date stated as 30 Nov 2025 (not stated in the October 2025 edition)
Also at KEITH
GSP view27 other sites at this grid supply point in the November 2026 edition, 23 of them at KEITH GRID, the same primary substation. In all, the sites here total 765 MW: 161 MW connected, 604 MW accepted to connect.
- SEGGIECROOK FARM BESS AND SOLARGREENTECH PROJECTS HOLDING UK LIMITED, Solar, KEITH GRID primaryAccepted126 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?