DAVIOT WINDFARM AND BESS
At INVERNESS
SSEN Embedded Capacity Register, June 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2030
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- DAVIOT WINDFARM AND BESS
- Address
- LAIGANDOUR, DAVIOT, INVERNESS, HIGHLAND, IV2 6XN
- Grid reference
- Easting 271065, northing 837954
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- INVERNESS
- Bulk supply point
- Not stated
- Primary substation
- INVERNESS GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 93 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 45 MW registered
- Registered capacity
- 93 MW
- Change to maximum export capacity
- 45 MW
- Change to maximum import capacity
- 45 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 1 Mar 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- April 2024 edition
Change history
Tracked from the April 2024 edition to the June 2026 edition, across 27 editions.
Changes to the details QueueWatch tracks, newest first.
- July 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
- November 2025 editionTarget energisation date stated as 31 Oct 2030 (not stated in the October 2025 edition)
Also at INVERNESS
GSP view7 other sites at this grid supply point in the November 2026 edition, 5 of them at INVERNESS GRID, the same primary substation. In all, the sites here total 160 MW: 70 MW connected, 90 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?