DAVIDSON FARM PV AND BESS
SSEN Embedded Capacity Register, July 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2035
- Status
- Accepted to connect
- Customer
- IG RENEWABLES LTD
- Site name
- DAVIDSON FARM PV AND BESS
- Address
- LAND SITUATED AT BONNETHILL FARM, MOSS-SIDE OLD SCHOOL AMD CLAYPOTS NEWMILL, KEITH, MORAY, AB55 6LD
- Grid reference
- Easting 345394, northing 853084
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- KEITH
- Bulk supply point
- Not stated
- Primary substation
- KEITH GRID
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 45.1 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 45 MW registered
- Registered capacity
- 45.1 MW
- Change to maximum export capacity
- 45 MW
- Change to maximum import capacity
- 47.439 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 16 Jul 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- July 2026 edition
Change history
Found in the July 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- August 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at KEITH
GSP view27 other sites at this grid supply point in the September 2026 edition, 23 of them at KEITH GRID, the same primary substation. In all, the sites here total 765 MW: 161 MW connected, 604 MW accepted to connect.
- SEGGIECROOK FARM BESS AND SOLARGREENTECH PROJECTS HOLDING UK LIMITED, Solar, KEITH GRID primaryAccepted126 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose