CHRATHAICH WIND FARM
CHRATHAICH RENEWABLES LLP at FASNAKYLE
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Sep 2031
- Status
- Accepted to connect
- Customer
- CHRATHAICH RENEWABLES LLP
- Site name
- CHRATHAICH WIND FARM
- Address
- CHRATHAICH WIND FARM, CHRATHAICH, BURNSIDE, HIGHLAND, IV63 7YJ
- Grid reference
- Easting 230845, northing 813150
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- FASNAKYLE
- Bulk supply point
- Not stated
- Primary substation
- FASNAKYLE GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 62.4 MW registered
- Registered capacity
- 62.4 MW
- Change to maximum export capacity
- 62.4 MW
- Change to maximum import capacity
- 0.632 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 10 Jun 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- July 2025 edition
Change history
Tracked since the July 2025 edition, across 17 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionExport capacity changed from 0.632 MW to 62.4 MW
- July 2026 editionExport capacity changed from 62.4 MW to 0.632 MW
- June 2026 editionExport capacity changed from 0.632 MW to 62.4 MW
- May 2026 editionExport capacity changed from 62.4 MW to 0.632 MW
- April 2026 editionExport capacity changed from 0.632 MW to 62.4 MW
- February 2026 editionExport capacity changed from 62.4 MW to 0.632 MW
- November 2025 editionTarget energisation date stated as 30 Sep 2031 (not stated in the October 2025 edition)
Also at FASNAKYLE
GSP view5 other sites at this grid supply point in the November 2026 edition, 4 of them at FASNAKYLE GRID, the same primary substation. In all, the sites here total 196 MW: 84 MW connected, 112 MW accepted to connect.
- CB CAVEAT FASNAKYLE BATTERY STORAGE - 49.9MWFASNAKYLE BATTERY STORAGE LTD, Storage, FASNAKYLE GRID primaryAccepted50 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?