BRACO WEST BESS

ITPENERGISED at BRACO WEST GRID

SSEN Embedded Capacity Register, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Dec 2026
Status
Accepted to connect
Customer
ITPENERGISED
Site name
BRACO WEST BESS
Address
BRACO WEST BESS, LAND AT BRACO WEST, DUNBLANE, STIRLING
Grid reference
Not stated
Licence area
North of Scotland (SHEPD)
Grid supply point
BRACO WEST GRID
Bulk supply point
Not stated
Primary substation
BRACO WEST GRID
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 49.9 MW registered
Registered capacity
49.9 MW
Change to maximum export capacity
49.9 MW
Change to maximum import capacity
52.526 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
1 Nov 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
March 2026 edition

Change history

Found in the March 2026 edition only.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at BRACO WEST GRID

GSP view

10 other sites at this grid supply point in the September 2026 edition, 7 of them at BRACO WEST GRID, the same primary substation. In all, the sites here total 328 MW: 33 MW connected, 295 MW accepted to connect.

See all 10

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose