QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BARRAN CALTUM WIND

BARRAN CALTUM CO-OPERATIVE WIND LIMITED at TAYNUILT

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
30 May 2014
Status
Connected
Customer
BARRAN CALTUM CO-OPERATIVE WIND LIMITED
Site name
BARRAN CALTUM WIND
Address
APPIN, ARGYLL AND BUTE, PA38 4BB
Grid reference
Easting 193596, northing 747037
Licence area
North of Scotland (SHEPD)
Grid supply point
TAYNUILT
Bulk supply point
Not stated
Primary substation
TAYNUILT GRID
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 1.14 MW registered
Registered capacity
1.14 MW
Maximum export capacity
1.14 MW
Maximum import capacity
0.014 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700052750694
Import MPAN
1700052750685
Last updated
12 Feb 2026
Tracked since
September 2023 edition

Change history

Tracked since the September 2023 edition, across 37 editions.

Changes to its status, capacity, technology or customer, newest first.

  • November 2023 edition
    Capacity changed from 1.2 MW to 1.14 MW

Also at TAYNUILT

GSP view

13 other sites at this grid supply point in the September 2026 edition, 12 of them at TAYNUILT GRID, the same primary substation. In all, the sites here total 270 MW: 54 MW connected, 216 MW accepted to connect.

See all 13

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose