ALLT NA MOINE HYDRO - IMPORT ADDCAP

ALLT NA MOINE HYDRO LTD at BROADFORD

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
12 Sep 2026
Status
Accepted to connect
Planning consent
Granted 28 Jul 2014
Highland, reference 14/00150/FUL · Source: REPD
Customer
ALLT NA MOINE HYDRO LTD
Site name
ALLT NA MOINE HYDRO - IMPORT ADDCAP
Address
ALLT NA MOINE HYDRO, KALNAKIL APPLECROSS, APPLECROSS, ROSS-SHIRE, IV54 8XL
Grid reference
Easting 169259, northing 854595
Licence area
North of Scotland (SHEPD)
Grid supply point
BROADFORD
Bulk supply point
Not stated
Primary substation
BROADFORD GRID
Connection voltage
33 kV
Technology group
Hydro and marine
Energy source 1
WATER, HYDRO - OTHER: 3.093 MW registered
Registered capacity
3.093 MW
Change to maximum export capacity
4.99 MW
Change to maximum import capacity
4.99 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
12 Sep 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
October 2025 edition

Change history

Tracked since the October 2025 edition, across 14 editions.

Changes to the details QueueWatch tracks, newest first.

  • September 2026 edition
    Export capacity changed from 3.093 MW to 4.99 MW
  • June 2026 edition
    Export capacity changed from 4.99 MW to 3.093 MW
  • February 2026 edition
    Export capacity changed from 0 MW to 4.99 MW
  • November 2025 edition
    Target energisation date stated as 12 Sep 2026 (not stated in the October 2025 edition)

Also at BROADFORD

GSP view

4 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 66 MW: 1.9 MW connected, 64.1 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.