56.8MW - LOCH NAN CUILLE WIND
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 20 Aug 2026
- Status
- Accepted to connect
- Customer
- RENANTIS UK LIMITED
- Site name
- 56.8MW - LOCH NAN CUILLE WIND
- Address
- LOCH NAN CUILLE WIND, BREAKACHY FARM BEAULY, INVERNESS, HIGHLAND, IV4 7AF
- Grid reference
- Easting 247530, northing 844959
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- BEAULY
- Bulk supply point
- Not stated
- Primary substation
- BEAULY GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 56.8 MW registered
- Registered capacity
- 56.8 MW
- Change to maximum export capacity
- 0.321 MW
- Change to maximum import capacity
- 0.321 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 20 Aug 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2025 edition
Change history
Tracked since the September 2025 edition, across 13 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at BEAULY
GSP view3 other sites at this grid supply point in the September 2026 edition, 1 of them at BEAULY GRID, the same primary substation. In all, the sites here total 122 MW: 15 MW connected, 107 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose