QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

28MW MAINS OF DUN PV

GREENTECH PROJECTS HOLDING UK LIMITED at BRIDGE OF DUN

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Jun 2032
Status
Accepted to connect
Customer
GREENTECH PROJECTS HOLDING UK LIMITED
Site name
28MW MAINS OF DUN PV
Address
MAINS OF DUN, MONTROSE, ANGUS, DD9 7PQ
Grid reference
Easting 361513, northing 761088
Licence area
North of Scotland (SHEPD)
Grid supply point
BRIDGE OF DUN
Bulk supply point
Not stated
Primary substation
BRIDGE OF DUN GRID
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 28 MW registered
Registered capacity
28 MW
Change to maximum export capacity
28 MW
Change to maximum import capacity
0.886 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
1 Aug 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
September 2023 edition

Change history

Tracked since the September 2023 edition, across 39 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 30 Jun 2032 (not stated in the October 2025 edition)

Also at BRIDGE OF DUN

GSP view

6 other sites at this grid supply point in the November 2026 edition, 5 of them at BRIDGE OF DUN GRID, the same primary substation. In all, the sites here total 272 MW: 272 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?