SHELLOCH B WIND FARM
At STRATHLEVEN
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2027
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- SHELLOCH B WIND FARM
- Address
- SPITTALHILL FARM, STIRLING, STIRLING, FK8 3JW
- Grid reference
- Easting 264430, northing 692068
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- STRATHLEVEN
- Bulk supply point
- Not stated
- Primary substation
- STRATHLEVEN
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 25 MW registered
- Registered capacity
- 25 MW
- Change to maximum export capacity
- 25 MW
- Change to maximum import capacity
- 1.053 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 16 Aug 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2023 edition
Change history
Tracked since the September 2023 edition, across 36 editions. Not found in the November 2023 edition.
Changes to its status, capacity, technology or customer, newest first.
- November 2023 editionNot found in this edition by its MPAN, grid reference or name and postcode
No change to its status, capacity, technology or customer.
Also at STRATHLEVEN
GSP view5 other sites at this grid supply point in the September 2026 edition, 1 of them at STRATHLEVEN, the same primary substation. In all, the sites here total 55.9 MW: 26.9 MW connected, 29 MW accepted to connect.
- AUCHENCARROCH ENERGY LTDAUCHENCARROCH LANDFILL, Bioenergy and waste, AUCHENCARROCH primaryConnected3.035 MW
- AUCHINCARROCH (GEN464G2)MELTON LG ENERGY LIMITED, Other or not stated, AUCHENCARROCH primaryConnected1.012 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose