QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

West Side Tyne Dock PV

West Side Tyne Dock PV at South Shields

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
27 Oct 2023
Status
Connected
Customer
West Side Tyne Dock PV
Site name
West Side Tyne Dock PV
Address
West Side, Tyne Dock, South Shields, Tyne and Wear, NE34 9PL
Grid reference
Easting 434737, northing 565521
Licence area
North East (Northern Powergrid)
Grid supply point
South Shields
Bulk supply point
South Shields
Primary substation
Simonside
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 3 MW registered
Registered capacity
3 MW
Maximum export capacity
0.999 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
11 May 2023
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
11 Sep 2023
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at South Shields

GSP view

2 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 73.1 MW: 38 MW connected, 35.1 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose