QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Wakefield Group Data Centre

Premier Way Data Centre DRUPS 2 at Ferrybridge B

Northern Powergrid Embedded Capacity Register 1MW and Over, June 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Premier Way Data Centre DRUPS 2
Site name
Wakefield Group Data Centre
Address
Wakefield Group Data Centre, Normanton Industrial Estate, Normanton, West Yorkshire, WF6 1GY
Grid reference
Easting 440930, northing 423090
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Ferrybridge B
Bulk supply point
Featherstone
Primary substation
Premier Way North No 2
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Oil, Engine (combustion / reciprocating): 32 MW registered
Registered capacity
32 MW
Maximum export capacity
0 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
2380001519788
Last updated
18 Sep 2024
Tracked since
June 2026 edition

Change history

Found in the June 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • July 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Ferrybridge B

GSP view

57 other sites at this grid supply point in the September 2026 edition, 1 of them at Premier Way North No 2, the same primary substation. In all, the sites here total 2.4 GW: 0.3 GW connected, 2.1 GW accepted to connect.

See all 57

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose