Valley Park CHP
Valley Park CHP at West Melton Section 3
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 21 Dec 2023
- Status
- Connected
- Customer
- Valley Park CHP
- Site name
- Valley Park CHP
- Address
- Cranswick Foods, Valley Park, Barnsley, North Yorkshire, S73 0UN
- Grid reference
- Easting 441242, northing 402510
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- West Melton Section 3
- Bulk supply point
- West Melton
- Primary substation
- Dearne Road
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Steam turbine (thermal power plant): 1.169 MW registered
- Registered capacity
- 1.169 MW
- Maximum export capacity
- 1.169 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 16 Mar 2020
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 22 Feb 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at West Melton Section 3
GSP view30 other sites at this grid supply point in the November 2026 edition, 3 of them at Dearne Road, the same primary substation. In all, the sites here total 499 MW: 220 MW connected, 279 MW accepted to connect.
- Landfill Gas GeneratorLandfill Gas Generator, Bioenergy and waste, Dearne Road primaryConnected3.8 MW
- Stepping Stone Solar and BESS HybridStepping Stone Solar and BESS Hybrid, Solar, Stepping Stone Solar and BESS Hybrid Direct primaryAccepted47.96 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?