Tofts Lane BESS

Tofts Lane BESS at West Melton Section 3

Northern Powergrid Embedded Capacity Register 1MW and Over, July 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Tofts Lane BESS
Site name
Tofts Lane BESS
Address
Hunshelf Compound, Toft's Lane, Barnsley, West Yorkshire, S63 6LS
Grid reference
Easting 440899, northing 400844
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
West Melton Section 3
Bulk supply point
Hunshelf
Primary substation
Tofts Lane BESS
Connection voltage
66 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 25 MW registered
Registered capacity
25 MW
Change to maximum export capacity
25 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
20 Apr 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 May 2024
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked from the March 2026 edition to the July 2026 edition, across 5 editions.

Changes to the details QueueWatch tracks, newest first.

  • August 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at West Melton Section 3

GSP view

31 other sites at this grid supply point in the November 2026 edition, 1 of them at Tofts Lane BESS, the same primary substation. In all, the sites here total 499 MW: 220 MW connected, 279 MW accepted to connect.

  • Tofts Lane BESSTofts Lane BESS, Storage, Tofts Lane BESS primaryAccepted25 MW
  • Echoing Hills SolarEchoing Hills Solar, Solar, Echoing Hills Solar primaryAccepted57 MW
  • Engine Lane PVEngine Lane PV, Solar, Engine Lane PV Direct primaryAccepted49.9 MW
  • Swangate BESSSwangate BESS, Storage, Swangate BESS Direct primaryConnected49.9 MW
  • Stepping Stone Solar and BESS HybridStepping Stone Solar and BESS Hybrid, Solar, Stepping Stone Solar and BESS Hybrid Direct primaryAccepted47.96 MW
  • Hunningley BESSHunningley BESS, Storage, Hunningley BESS Direct primaryConnected40 MW
  • Jakto TransportOaks Lane BESS, Gas and other fossil, Oak Lane BESS primaryConnected40 MW
  • Woolley Solar ParkWoolley Solar Park, Solar, Woolley Solar Park primaryAccepted29.93 MW

See all 31

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?