Stripe Lane Hybrid

Stripe Lane Hybrid at Poppleton

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Stripe Lane Hybrid
Site name
Stripe Lane Hybrid
Address
Land off Stripe Lane, Overton, York, North Yorkshire, YO30 1YL
Grid reference
Easting 455255, northing 455881
Licence area
North East (Northern Powergrid)
Grid supply point
Poppleton
Bulk supply point
Poppleton
Primary substation
Stripe Lane Hybrid
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 25.935 MW registered
Energy source 2
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 25.935 MW registered, storage 49.9 MWh, 1 hours of storage
Registered capacity
51.87 MW
Change to maximum export capacity
51.87 MW
Change to maximum import capacity
47.405 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
16 Dec 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Jan 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Poppleton

GSP view

12 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 657 MW: 5 MW connected, 652 MW accepted to connect.

See all 12

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?