Springfield Farm
Bluebell Battery Bank at Ferrybridge B
Northern Powergrid Embedded Capacity Register 1MW and Over, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Bluebell Battery Bank
- Site name
- Springfield Farm
- Address
- Springfield Farm, Weeland Road, Goole, West Yorkshire, DN14 0RL
- Grid reference
- Easting 457525, northing 423108
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Ferrybridge B
- Bulk supply point
- Bluebell Battery Bank
- Primary substation
- Bluebell Battery Bank Direct
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 240 MW registered
- Registered capacity
- 240 MW
- Change to maximum export capacity
- 240 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 7 Dec 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 8 May 2024
- Tracked since
- August 2026 edition
Change history
Found in the August 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- September 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Ferrybridge B
GSP view57 other sites at this grid supply point in the September 2026 edition, 1 of them at Bluebell Battery Bank Direct, the same primary substation. In all, the sites here total 2.4 GW: 0.3 GW connected, 2.1 GW accepted to connect.
- 200MW BESS at Land to West of Stocking Lane200MW BESS at Land to West of Stocking Lane, Storage, Stocking Lane BESS Direct primaryAccepted200 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose