Sisters Wind Farm
Sisters Wind Farm at Blyth 66kV
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 13 Jun 2016
- Status
- Connected
- Customer
- Sisters Wind Farm
- Site name
- Sisters Wind Farm
- Address
- Sisters Wind Farm, Widdrington, Morpeth, Northumberland, NE61 5ED
- Grid reference
- Easting 425377, northing 595667
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Blyth 66kV
- Bulk supply point
- Blyth 66kV
- Primary substation
- Widdrington Church Windfarm
- Connection voltage
- 66 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 8.2 MW registered
- Registered capacity
- 8.2 MW
- Maximum export capacity
- 8.2 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 2 Sep 2014
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000324470
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Blyth 66kV
GSP view24 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 602 MW: 140 MW connected, 462 MW accepted to connect.
- Blyth Offshore WindfarmBlyth Offshore Wind Farm - Remaining Buildout, Wind, Blyth Offshore Windfarm primaryAccepted58.4 MW
- Blyth Offshore WindfarmBlyth Offshore Windfarm - Currently Installed, Wind, Blyth Offshore Windfarm primaryConnected41.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose