ProposalsIt Gas

ProposalsIt Gas at West Melton Section 3

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
ProposalsIt Gas
Site name
ProposalsIt Gas
Address
Land off, Old doncaster road, Rotherham, West Yorkshire, S63 7EE
Grid reference
Easting 444572, northing 400982
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
West Melton Section 3
Bulk supply point
West Melton
Primary substation
Wath Upon Dearne
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 3 MW registered
Registered capacity
3 MW
Change to maximum export capacity
3 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
17 Aug 2020
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 May 2024
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, across 4 editions.

Another record at this location is on a separate page.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at West Melton Section 3

GSP view

30 other sites at this grid supply point in the November 2026 edition, 2 of them at Wath Upon Dearne, the same primary substation. In all, the sites here total 499 MW: 220 MW connected, 279 MW accepted to connect.

  • The FoundryThe Foundry, Gas and other fossil, Wath Upon Dearne primaryConnected8 MW
  • Aldi Goldthorpe SolarAldi Goldthorpe Solar, Solar, Wath Upon Dearne primaryConnected1.499 MW
  • Echoing Hills SolarEchoing Hills Solar, Solar, Echoing Hills Solar primaryAccepted57 MW
  • Engine Lane PVEngine Lane PV, Solar, Engine Lane PV Direct primaryAccepted49.9 MW
  • Swangate BESSSwangate BESS, Storage, Swangate BESS Direct primaryConnected49.9 MW
  • Stepping Stone Solar and BESS HybridStepping Stone Solar and BESS Hybrid, Solar, Stepping Stone Solar and BESS Hybrid Direct primaryAccepted47.96 MW
  • Hunningley BESSHunningley BESS, Storage, Hunningley BESS Direct primaryConnected40 MW
  • Jakto TransportOaks Lane BESS, Gas and other fossil, Oak Lane BESS primaryConnected40 MW

See all 30

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?