Non-Exporting Backup Gens, Emley Moor TV Transmitter
Non-Exporting Backup Gens, Emley Moor TV Transmitter at West Melton Section 3
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Non-Exporting Backup Gens, Emley Moor TV Transmitter
- Site name
- Non-Exporting Backup Gens, Emley Moor TV Transmitter
- Address
- Jagger Lane, Emley Moor, Huddersfield, West Yorkshire, HD8 9TQ
- Grid reference
- Easting 422200, northing 412956
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- West Melton Section 3
- Bulk supply point
- Barugh 132/66kV
- Primary substation
- Scissett
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 2.5 MW registered
- Registered capacity
- 2.5 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 21 Aug 2018
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Sep 2018
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at West Melton Section 3
GSP view30 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 499 MW: 220 MW connected, 279 MW accepted to connect.
- Stepping Stone Solar and BESS HybridStepping Stone Solar and BESS Hybrid, Solar, Stepping Stone Solar and BESS Hybrid Direct primaryAccepted47.96 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?