QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

MITCHELLS INDUSTRIAL PARK

MITCHELLS INDUSTRIAL PARK at West Melton Section 3

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
8 Dec 2022
Status
Connected
Customer
MITCHELLS INDUSTRIAL PARK
Site name
MITCHELLS INDUSTRIAL PARK
Address
MITCHELLS INDUSTRIAL PARK, BRADBERRY BALK LANE, BARNSLEY, South Yorkshire, S73 8HR
Grid reference
Easting 439229, northing 404159
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
West Melton Section 3
Bulk supply point
West Melton
Primary substation
Aldham
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam turbine (thermal power plant): 8 MW registered
Registered capacity
8 MW
Maximum export capacity
8 MW
Maximum import capacity
0.142 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
26 Jun 2020
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394200160419
Import MPAN
2380002797024
Last updated
11 Sep 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at West Melton Section 3

GSP view

30 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 499 MW: 220 MW connected, 279 MW accepted to connect.

  • Echoing Hills SolarEchoing Hills Solar, Solar, Echoing Hills Solar primaryAccepted57 MW
  • Engine Lane PVEngine Lane PV, Solar, Engine Lane PV Direct primaryAccepted49.9 MW
  • Swangate BESSSwangate BESS, Storage, Swangate BESS Direct primaryConnected49.9 MW
  • Stepping Stone Solar and BESS HybridStepping Stone Solar and BESS Hybrid, Solar, Stepping Stone Solar and BESS Hybrid Direct primaryAccepted47.96 MW
  • Hunningley BESSHunningley BESS, Storage, Hunningley BESS Direct primaryConnected40 MW
  • Jakto TransportOaks Lane BESS, Gas and other fossil, Oak Lane BESS primaryConnected40 MW
  • Woolley Solar ParkWoolley Solar Park, Solar, Woolley Solar Park primaryAccepted29.93 MW
  • Elsecar Road BESSElsecar Road BESS, Storage, Elsecar Road BESS primaryAccepted26 MW

See all 30

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?