Leggett & Platt PV
Leggett & Platt PV at Ferrybridge A
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Leggett & Platt PV
- Site name
- Leggett & Platt PV
- Address
- Leggett & Platt, Park Springs Industrial Estate, Barnsley, West Yorkshire, S72 7GH
- Grid reference
- Easting 440723, northing 408817
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Ferrybridge A
- Bulk supply point
- Ferrybridge A
- Primary substation
- Grimethorpe
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 2.89 MW registered
- Registered capacity
- 2.89 MW
- Change to maximum export capacity
- 2.89 MW
- Change to maximum import capacity
- 2.375 MW
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 19 Mar 2026
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- 2336591075018
- Last updated
- 14 May 2026
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 5 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Ferrybridge A
GSP view16 other sites at this grid supply point in the September 2026 edition, 1 of them at Grimethorpe, the same primary substation. In all, the sites here total 298 MW: 31 MW connected, 267 MW accepted to connect.
- Grimethorpe GenerationGrimethorpe Generation, Gas and other fossil, Grimethorpe primaryConnected5.499 MW
- Eggborough WtE Plant & BESSEggborough WtE Plant & BESS, Bioenergy and waste, Hut Green Generation primaryAccepted20 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose