QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Kiln Pit Hill

Kiln Pit Hill at Stella South

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
27 Sep 2011
Status
Connected
Customer
Kiln Pit Hill
Site name
Kiln Pit Hill
Address
Wind Farm, Kiln Pit Hill, Consett, County Durham, DH8 9SL
Grid reference
Easting 404840, northing 553936
Licence area
North East (Northern Powergrid)
Grid supply point
Stella South
Bulk supply point
Annfield
Primary substation
Consett
Connection voltage
20 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 13.8 MW registered
Registered capacity
13.8 MW
Maximum export capacity
13.3 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574000303328
Import MPAN
1574000303550
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Stella South

GSP view

29 other sites at this grid supply point in the September 2026 edition, 2 of them at Consett, the same primary substation. In all, the sites here total 1.1 GW: 42.4 MW connected, 1.1 GW accepted to connect.

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose