High Haswell Wind Farm

High Haswell Wind Farm at Hartmoor

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
21 Feb 2011
Status
Connected
Planning consent
Granted 18 Dec 2007
County Durham, reference PLAN/2007/0223 · Source: REPD
Customer
High Haswell Wind Farm
Site name
High Haswell Wind Farm
Address
High Haswell Wind Farm, Durham Lane, Haswell, County Durham, DH6 2BD
Grid reference
Easting 435490, northing 542594
Licence area
North East (Northern Powergrid)
Grid supply point
Hartmoor
Bulk supply point
Hartmoor
Primary substation
Peterlee West
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 3.8 MW registered
Registered capacity
3.8 MW
Maximum export capacity
3.8 MW
Maximum import capacity
0.095 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
10 Jun 2010
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574000297710
Import MPAN
1580001077144
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Hartmoor

GSP view

22 other sites at this grid supply point in the November 2026 edition, 1 of them at Peterlee West, the same primary substation. In all, the sites here total 715 MW: 116 MW connected, 599 MW accepted to connect.

See all 22

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.