Hexham General Hospital
Hexham General Hospital at Fourstones 20kV
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Apr 2002
- Status
- Connected
- Customer
- Hexham General Hospital
- Site name
- Hexham General Hospital
- Address
- Hexham General Hospital, Corbridge Road, Hexham, Northumberland, NE46 1QJ
- Grid reference
- Easting 393874, northing 564044
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Fourstones 20kV
- Bulk supply point
- Fourstones 20kV
- Primary substation
- Fourstones 20kV Direct
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 1.36 MW registered
- Registered capacity
- 1.36 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- 1507894659990
- Last updated
- 13 May 2022
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Fourstones 20kV
GSP view1 other site at this grid supply point in the September 2026 edition, 1 of them at Fourstones 20kV Direct, the same primary substation. In all, the sites here total 37.4 MW: 37.4 MW connected.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose