Hartlepool University Hospital Phase 2 PV
Hartlepool University Hospital Phase 2 PV at Hartmoor
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Hartlepool University Hospital Phase 2 PV
- Site name
- Hartlepool University Hospital Phase 2 PV
- Address
- Hartlepool University Hospital, Holdforth Road, Hartlepool, County Durham, TS24 9AH
- Grid reference
- Easting 449759, northing 534492
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Hartmoor
- Bulk supply point
- Hartmoor
- Primary substation
- Amberton Road
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.488 MW registered
- Registered capacity
- 1.488 MW
- Change to maximum export capacity
- 1.488 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 13 May 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Jun 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Hartmoor
GSP view22 other sites at this grid supply point in the November 2026 edition, 1 of them at Amberton Road, the same primary substation. In all, the sites here total 715 MW: 116 MW connected, 599 MW accepted to connect.
- Hartlepool University HospitalHartlepool University Hospital, Gas and other fossil, Amberton Road primaryConnected2 MW
- High Barnes Farm HybridHigh Barnes Farm Hybrid, Storage, High Barnes Farm Hybrid primaryAccepted75 MW
- Brenda Road 49.9MW BESSBrenda Road 49.9MW BESS, Storage, Brenda Road 49.9MW BESS primaryAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?