Ewden WTW
Ewden WTW at West Melton Section 3
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Ewden WTW
- Site name
- Ewden WTW
- Address
- 400 MAIN ROAD, WHARNCLIFFE SIDE, SHEFFIELD, South Yorkshire, S35 0BN
- Grid reference
- Easting 429815, northing 395526
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- West Melton Section 3
- Bulk supply point
- Hunshelf
- Primary substation
- Wheatacre Road
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 1.348 MW registered
- Registered capacity
- 1.348 MW
- Maximum export capacity
- 1.348 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2336541845018
- Import MPAN
- Not stated
- Last updated
- 15 Nov 2021
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at West Melton Section 3
GSP view30 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 499 MW: 220 MW connected, 279 MW accepted to connect.
- Stepping Stone Solar and BESS HybridStepping Stone Solar and BESS Hybrid, Solar, Stepping Stone Solar and BESS Hybrid Direct primaryAccepted47.96 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose