Dyche Lane BESS
Dyche Lane BESS at Jordanthorpe
Northern Powergrid Embedded Capacity Register 1MW and Over, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Dyche Lane BESS
- Site name
- Dyche Lane BESS
- Address
- Dyche Lane, Coal Aston, Dronfield, Derbyshire, S18 3AA
- Grid reference
- Easting 435909, northing 379993
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Jordanthorpe
- Bulk supply point
- Jordanthorpe
- Primary substation
- Dyche Lane BESS
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 45 MW registered
- Registered capacity
- 45 MW
- Change to maximum export capacity
- 45 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 23 Mar 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Apr 2023
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked from the March 2026 edition to the August 2026 edition, across 6 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
No change to any detail QueueWatch tracks.
Also at Jordanthorpe
GSP view2 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 75 MW: 75 MW accepted to connect.
- Mansion House Farm HybridMansion House Farm Hybrid, Solar, Mansion House Farm BESS primaryAccepted40 MW
- Bochum Parkway Combined TechBochum Parkway Combined Tech, Storage, Bochum Parkway Combined Tech primaryAccepted35 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?