CRT Keadby 2 BESS
CRT Keadby 2 BESS at Keadby 3 (Future)
Northern Powergrid Embedded Capacity Register 1MW and Over, June 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- CRT Keadby 2 BESS
- Site name
- CRT Keadby 2 BESS
- Address
- Ealand Road, Keadby, Scunthorpe, Lincolnshire, DN17 3ER
- Grid reference
- Easting 482472, northing 411528
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Keadby 3 (Future)
- Bulk supply point
- CRT Keadby 2 BESS
- Primary substation
- CRT Keadby 2 BESS Direct
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 240 MW registered, storage 480 MWh, 2 hours of storage
- Registered capacity
- 240 MW
- Change to maximum export capacity
- 240 MW
- Change to maximum import capacity
- 239.97 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 2 Oct 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 9 Apr 2025
- Tracked since
- March 2026 edition
Change history
Tracked from the March 2026 edition to the June 2026 edition, across 4 editions.
Changes to its status, capacity, technology or customer, newest first.
- July 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No change to its status, capacity, technology or customer.
Also at Keadby 3 (Future)
GSP view1 other site at this grid supply point in the September 2026 edition. In all, the sites here total 62 MW: 62 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose