Church Lane
Church Lane at Ferrybridge A
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Church Lane
- Site name
- Church Lane
- Address
- Land North of Church Lane, South Hiendley, Barnsley, South Yorkshire, S72 9DH
- Grid reference
- Easting 438591, northing 412673
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Ferrybridge A
- Bulk supply point
- Ferrybridge A
- Primary substation
- Monckton
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 6 MW registered
- Registered capacity
- 6 MW
- Change to maximum export capacity
- 6 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 24 May 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Jun 2022
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Ferrybridge A
GSP view16 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 298 MW: 31 MW connected, 267 MW accepted to connect.
- Eggborough WtE Plant & BESSEggborough WtE Plant & BESS, Bioenergy and waste, Hut Green Generation primaryAccepted20 MW
- Saint Gobain Glass UK Limited (Non-Exporting)Saint Gobain Glass UK Limited (Non-Exporting), Gas and other fossil, Saint Gobain Glass primaryConnected16 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?