Carlisle Street BESS

Carlisle Street BESS at Pitsmoor 3/4

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Carlisle Street BESS
Site name
Carlisle Street BESS
Address
Land at 559, Carlisle Street East, Sheffield, North Yorkshire, S4 8DT
Grid reference
Easting 437136, northing 389532
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Pitsmoor 3/4
Bulk supply point
Pitsmoor 3/4
Primary substation
Carlisle Street BESS
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 40 MW registered
Registered capacity
40 MW
Change to maximum export capacity
40 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
8 Apr 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Mar 2023
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Pitsmoor 3/4

GSP view

2 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 120 MW: 120 MW accepted to connect.

  • Petre Street BESSPetre Street BESS, Storage, Petre Street Generation primaryAccepted49.5 MW
  • Vox Sydney BESSVox Sydney BESS, Storage, Vox Sydney BESS primaryAccepted30 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose