Calderdale Wind Farm

Calderdale Wind Farm at New Bradford West (Future)

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Calderdale Wind Farm
Site name
Calderdale Wind Farm
Address
Calderdale Wind Farm, Walshaw Moor Estate, Widdop, West Yorkshire, HX7 7AT
Grid reference
Easting 395449, northing 431628
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
New Bradford West (Future)
Bulk supply point
Calderdale Wind Farm
Primary substation
Calderdale Wind Farm Direct
Connection voltage
132 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 240 MW registered
Registered capacity
240 MW
Change to maximum export capacity
240 MW
Change to maximum import capacity
4.75 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
12 May 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Jun 2026
Tracked since
June 2026 edition

Change history

Tracked since the June 2026 edition, across 6 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at New Bradford West (Future)

GSP view

No other site in Northern Powergrid’s November 2026 edition is at this grid supply point.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?