QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Avenue Road PV

Avenue Road PV at Blyth 66kV

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2025
Status
Connected
Customer
Avenue Road PV
Site name
Avenue Road PV
Address
Northumberland Healthcare NHS Foundation Trust, 1, Avenue Road, Seaton Delaval, Northumberland, NE25 0QJ
Grid reference
Easting 430275, northing 574977
Licence area
North East (Northern Powergrid)
Grid supply point
Blyth 66kV
Bulk supply point
Blyth 66kV
Primary substation
Seghill
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 2.5 MW registered
Registered capacity
2.5 MW
Maximum export capacity
0 MW
Maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
12 Jan 2024
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 Jul 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Blyth 66kV

GSP view

24 other sites at this grid supply point in the November 2026 edition, 1 of them at Seghill, the same primary substation. In all, the sites here total 602 MW: 140 MW connected, 462 MW accepted to connect.

See all 24

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?