Worcester spetchley clayfield road plot 6a ionos
1&1 ionos ltd at Bishops Wood 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Mar 2022
- Status
- Connected
- Customer
- 1&1 ionos ltd
- Site name
- Worcester spetchley clayfield road plot 6a ionos
- Address
- Unit 6A, Ionos, Clayfield Road, , Spetchley, Worcester, WR4 0AE
- Grid reference
- Easting 389427, northing 256483
- Licence area
- West Midlands
- Grid supply point
- Bishops Wood 132Kv S Stn
- Bulk supply point
- Warndon 132Kv S Stn
- Primary substation
- Warndon 132/11Kv
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Other, Engine (combustion / reciprocating): 4.4 MW registered
- Energy source 2
- Solar, Photovoltaic: 0.656 MW registered
- Registered capacity
- 5.056 MW
- Maximum export capacity
- 0.618 MW
- Maximum import capacity
- 9.5 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1470001378207
- Import MPAN
- 1470001278432/1470001278441
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Bishops Wood 132Kv S Stn
GSP view61 other sites at this grid supply point in the August 2026 edition, 1 of them at Warndon 132/11Kv, the same primary substation. In all, the sites here total 1.2 GW: 0.3 GW connected, 0.9 GW accepted to connect.
- Worcester blackpole hindlip lane storAdv001 ltd, Gas and other fossil, Warndon 132/11Kv primaryConnected7.8 MW
- Jbm solar projects 31 ltdJbm solar projects 31 ltd, Storage, Malvern 132/11Kv primaryAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose