Wellington poole waste disposal site import/export site

Valencia energy ltd at Taunton Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Feb 2005
Status
Connected
Customer
Valencia energy ltd
Site name
Wellington poole waste disposal site import/export site
Address
Edl Uk, Generation Plant, Poole Landfill Site, East Nynehead Road, Nynehead, Wellington, Somerset, TA21 9HH
Grid reference
Easting 315148, northing 121826
Licence area
South West
Grid supply point
Taunton Sgp
Bulk supply point
Taunton Main Bsp
Primary substation
Wellington Town
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Biofuel - Landfill gas, Gas turbine (OCGT): 1.25 MW registered
Registered capacity
1.25 MW
Maximum export capacity
1.33 MW
Maximum import capacity
0.19 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2200040870944
Import MPAN
2200040870953
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Taunton Sgp

GSP view

35 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 577 MW: 120 MW connected, 457 MW accepted to connect.

See all 35

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose