QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Toyota motor manufacturing

Toyota motor manufacturing (uk) ltd at Drakelow 132Kv

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
20 Dec 2012
Status
Connected
Customer
Toyota motor manufacturing (uk) ltd
Site name
Toyota motor manufacturing
Address
Toyota Motor Manufacturing (Uk) Limited, Derby, Derbyshire, DE1 9TA
Grid reference
Easting 429448, northing 330612
Licence area
East Midlands
Grid supply point
Drakelow 132Kv
Bulk supply point
Burton 33Kv
Primary substation
Trent Alloys 33 11Kv S Stn
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 4.186 MW registered
Registered capacity
4.186 MW
Maximum export capacity
4.56 MW
Maximum import capacity
28.5 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1160001439301
Import MPAN
1100039603559
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Drakelow 132Kv

GSP view

40 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 602 MW: 167 MW connected, 435 MW accepted to connect.

See all 40

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose