The forge, lye forge
Power generation (midland)ltd at Bishops Wood 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Mar 2028
- Status
- Accepted to connect
- Customer
- Power generation (midland)ltd
- Site name
- The forge, lye forge
- Address
- Stourport Road, Kidderminster, DY11 7QE
- Grid reference
- Easting 382091, northing 273709
NGED’s register gives it in tenths of a metre. - Licence area
- West Midlands
- Grid supply point
- Bishops Wood 132Kv S Stn
- Bulk supply point
- Kidderminster 132Kv S Stn
- Primary substation
- Kidderminster 132/33/11Kv
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 5.5 MW registered
- Registered capacity
- 5.5 MW
- Change to maximum export capacity
- 5.5 MW
- Change to maximum import capacity
- 0.5 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 21 Feb 2019
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Bishops Wood 132Kv S Stn
GSP view61 other sites at this grid supply point in the August 2026 edition, 1 of them at Kidderminster 132/33/11Kv, the same primary substation. In all, the sites here total 1.2 GW: 0.3 GW connected, 0.9 GW accepted to connect.
- Jbm solar projects 31 ltdJbm solar projects 31 ltd, Storage, Malvern 132/11Kv primaryAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?