T/a budweiser brewing group uk&i

Ab inbev uk limited

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
14 Oct 2020
Status
Connected
Customer
Ab inbev uk limited
Site name
T/a budweiser brewing group uk&i
Address
Feeder 1, Whitbread Brewery, Magor, Newport, NP26 3DA
Grid reference
Easting 341557, northing 187287
Licence area
South Wales
Grid supply point
Not stated
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 3.5 MW registered
Registered capacity
3.5 MW
Maximum export capacity
6.65 MW
Maximum import capacity
13.3 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2100040023638/2100040023647
Import MPAN
2189999996884/2189999996893
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?