Poplars phase three
Summerleaze re-generation limited at Rugeley 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Dec 2006
- Status
- Connected
- Customer
- Summerleaze re-generation limited
- Site name
- Poplars phase three
- Address
- Poplars Landfill Site, Lichfield Road, Cannock, Staffordshire, WS11 8NQ
- Grid reference
- Easting 399527, northing 308837
- Licence area
- West Midlands
- Grid supply point
- Rugeley 132Kv S Stn
- Bulk supply point
- Cannock 132Kv S Stn
- Primary substation
- Cannock 132/11Kv
- Connection voltage
- 0.4 kV
- Technology group
- Other or not stated
- Energy source 1
- 4.6 MW registered
- Registered capacity
- 4.6 MW
- Maximum export capacity
- 4.37 MW
- Maximum import capacity
- 0.238 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1430000008301
- Import MPAN
- 1460000368451
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Rugeley 132Kv S Stn
GSP view17 other sites at this grid supply point in the August 2026 edition, 3 of them at Cannock 132/11Kv, the same primary substation. In all, the sites here total 581 MW: 60 MW connected, 521 MW accepted to connect.
- Biffa generation 2 importBiffa waste services limited, Other or not stated, Cannock 132/11Kv primaryConnected4 MW
- Poplars landfillInfinis (re-gen) limited, Other or not stated, Cannock 132/11Kv primaryConnected3.9 MW
- Biffa generation 1 importUk power solutions, Other or not stated, Cannock 132/11Kv primaryConnected2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?