North curry, higher knapp farm
Lightsource spv 36 limited at Bridgwater Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 21 Mar 2013
- Status
- Connected
- Planning consent
- Granted 11 Jan 2013
Somerset, reference 24/12/0039 · Source: REPD - Customer
- Lightsource spv 36 limited
- Site name
- North curry, higher knapp farm
- Address
- Higher Knapp Farm, Knapp, North Curry, Taunton, Somerset, TA3 6AY
- Grid reference
- Easting 330319, northing 125325
- Licence area
- South West
- Grid supply point
- Bridgwater Sgp
- Bulk supply point
- Bridgwater Grid Bsp
- Primary substation
- Creech St Michael
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.132 MW registered
- Registered capacity
- 1.132 MW
- Maximum export capacity
- 1.112 MW
- Maximum import capacity
- 0.048 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200042202600
- Import MPAN
- 2200042202594
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Bridgwater Sgp
GSP view52 other sites at this grid supply point in the August 2026 edition, 2 of them at Creech St Michael, the same primary substation. In all, the sites here total 620 MW: 189 MW connected, 431 MW accepted to connect.
- Taunton poundpool lane solar park, withymeadAton energy solar uk 1 limited, Solar, Creech St Michael primaryConnected1 MW
- Taunton creech st michael ham stwWessex water services ltd, Gas and other fossil, Creech St Michael primaryConnected0.944 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.