QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Mark yardwall manor farm solar park

Second generation yardwall limited at Bridgwater Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
28 May 2015
Status
Connected
Planning consent
Granted 29 Sep 2014
Somerset, reference 33/14/00024 · Source: REPD
Customer
Second generation yardwall limited
Site name
Mark yardwall manor farm solar park
Address
Yardwall Manor Farm, Yardwall Road, Mark, Highbridge, Somerset, TA9 4QE
Grid reference
Easting 336332, northing 146921
Licence area
South West
Grid supply point
Bridgwater Sgp
Bulk supply point
Bridgwater Grid Bsp
Primary substation
Watchfield
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 2.8 MW registered
Registered capacity
2.8 MW
Maximum export capacity
2.375 MW
Maximum import capacity
0.043 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2200042511659
Import MPAN
2200042511630
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Bridgwater Sgp

GSP view

52 other sites at this grid supply point in the August 2026 edition, 1 of them at Watchfield, the same primary substation. In all, the sites here total 620 MW: 189 MW connected, 431 MW accepted to connect.

See all 52

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.