Lincoln county hospital greetwell road
United lincolnshire hospitals nhs trust at West Burton 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Dec 2024
- Status
- Connected
- Customer
- United lincolnshire hospitals nhs trust
- Site name
- Lincoln county hospital greetwell road
- Address
- United Lincolnshire Hospitals Nhs Lincoln County Hospital, Greetwell Road, Lincoln, Lincolnshire, LN2 5QY
- Grid reference
- Easting 498812, northing 381816
- Licence area
- East Midlands
- Grid supply point
- West Burton 132Kv S Stn
- Bulk supply point
- Lincoln Local 132Kv S Stn
- Primary substation
- Lincoln No 2 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 1.497 MW registered
- Energy source 2
- Solar, Photovoltaic: 0.088 MW registered
- Registered capacity
- 1.585 MW
- Maximum export capacity
- 1.506 MW
- Maximum import capacity
- 2.375 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1100770561679
- Import MPAN
- 1100039604604
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at West Burton 132Kv S Stn
GSP view36 other sites at this grid supply point in the August 2026 edition, 2 of them at Lincoln No 2 11Kv S Stn, the same primary substation. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.
- Sewage works washingborough road canwickAnglian water services ltd, Other or not stated, Lincoln No 2 11Kv S Stn primaryConnected3.01 MW
- Ruston works waterside southAlstom gas turbines ltd, Other or not stated, Lincoln No 2 11Kv S Stn primaryConnected2.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?