Land at north court farm
clean earth energy ltd at Uskmouth
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 23 Dec 2026
- Status
- Accepted to connect
- Customer
- clean earth energy ltd
- Site name
- Land at north court farm
- Address
- Rush Wall Lane, Redwick, NP26 3DX
- Grid reference
- Easting 34098700000000000, northing 1852000000000000
- Licence area
- South Wales
- Grid supply point
- Uskmouth
- Bulk supply point
- Magor Grid
- Primary substation
- Magor Primary
- Connection voltage
- 11 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 7.6 MW registered
- Registered capacity
- 7.6 MW
- Change to maximum export capacity
- 7.6 MW
- Change to maximum import capacity
- 0.015 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 3 Jun 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Uskmouth
GSP view38 other sites at this grid supply point in the August 2026 edition, 5 of them at Magor Primary, the same primary substation. In all, the sites here total 1.0 GW: 0.1 GW connected, 0.9 GW accepted to connect.
- Newport magor tesco trunking centre import/exportTesco stores limited, Gas and other fossil, Magor Primary primaryConnected2.05 MW
- Tesco magor distribution centreTesco stores limited, Gas and other fossil, Magor Primary primaryConnected2.05 MW
- Magor, longlands lane wtLonglands lane renewables limited, Wind, Magor Primary primaryConnected1.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?