QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Inner dowsing wind farm

Inner dowsing wind farm

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jan 2008
Status
Connected
Customer
Inner dowsing wind farm
Site name
Inner dowsing wind farm
Address
Lynn & Inner Dowsing Wind Farms, Inner Dowsing, Middle Marsh Road, Ashington End, Skegness, Lincolnshire, PE24 4UD
Grid reference
Easting 553366, northing 365070
Licence area
East Midlands
Grid supply point
Not stated
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Wind
Energy source 1
Wind, Offshore wind turbines: 97.2 MW registered
Registered capacity
97.2 MW
Maximum export capacity
85.5 MW
Maximum import capacity
1.9 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1130000044031
Import MPAN
1130000044022
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?