Holditch power limited (mercia power no2 85/7473)
Holditch power limited at Cellarhead 132Kv
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 16 Jul 2024
- Status
- Connected
- Customer
- Holditch power limited
- Site name
- Holditch power limited (mercia power no2 85/7473)
- Address
- (No 2 Feeder) Elecrical Substation Group, Hamptons Industrial Estate, Holditch Road, Chesterton, Newcastle under lyme, Staffordshire, ST5 9JA
- Grid reference
- Easting 383804, northing 348070
- Licence area
- West Midlands
- Grid supply point
- Cellarhead 132Kv
- Bulk supply point
- Newcastle 132Kv S Stn
- Primary substation
- Newcastle 132/11Kv
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 3.342 MW registered
- Registered capacity
- 3.342 MW
- Maximum export capacity
- 3.342 MW
- Maximum import capacity
- 0.143 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1424886500000
- Import MPAN
- 1423886500009
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Cellarhead 132Kv
GSP view40 other sites at this grid supply point in the August 2026 edition, 3 of them at Newcastle 132/11Kv, the same primary substation. In all, the sites here total 1.2 GW: 0.2 GW connected, 1.0 GW accepted to connect.
- Holditch power limited (mercia power no 1 85/7458)Holditch power limited, Gas and other fossil, Newcastle 132/11Kv primaryConnected4.542 MW
- Walleys quarry landfill siteClp envirogas, Bioenergy and waste, Newcastle 132/11Kv primaryConnected2 MW
- Land at armshead farm, ref cellarhead bessConrad energy (developments) ii limited, StorageAccepted99 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?