QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Hockholler pv, uka225

Pace psr renewable energy hold co ltd at Taunton Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
25 May 2027
Status
Accepted to connect
Customer
Pace psr renewable energy hold co ltd
Site name
Hockholler pv, uka225
Address
Land West Of Regent Street, Tone Green, Bradford-on-tone, Taunton, TA4 1HN
Grid reference
Easting 317051, northing 123034
NGED’s register gives it in tenths of a metre.
Licence area
South West
Grid supply point
Taunton Sgp
Bulk supply point
Taunton Main Bsp
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 20 MW registered
Registered capacity
20 MW
Change to maximum export capacity
20 MW
Change to maximum import capacity
0.5 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
17 Jan 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Taunton Sgp

GSP view

35 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 577 MW: 120 MW connected, 457 MW accepted to connect.

See all 35

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?