QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Gp biotec ltd

Gp biotec ltd at Rassau Gsp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
25 Mar 2015
Status
Connected
Customer
Gp biotec ltd
Site name
Gp biotec ltd
Address
Bio Digester, Great Porthamel, Talgarth, Brecon, Powys, LD3 0DL
Grid reference
Easting 3160380, northing 2350010
Licence area
South Wales
Grid supply point
Rassau Gsp
Bulk supply point
Abergavenny
Primary substation
Glasbury
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Biomass, Steam turbine (thermal power plant): 1.5 MW registered
Registered capacity
1.5 MW
Maximum export capacity
1.425 MW
Maximum import capacity
0.095 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2100041115918
Import MPAN
2100041097729
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Rassau Gsp

GSP view

37 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 575 MW: 202 MW connected, 373 MW accepted to connect.

See all 37

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose