QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Edwin richards quarry

Edwin richards energy storage park ltd at Oldbury 132Kv

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
2 Feb 2027
Status
Accepted to connect
Customer
Edwin richards energy storage park ltd
Site name
Edwin richards quarry
Address
Rowley regis, B65 9DS
Grid reference
Not stated
Licence area
West Midlands
Grid supply point
Oldbury 132Kv
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 99 MW registered
Registered capacity
99 MW
Change to maximum export capacity
99 MW
Change to maximum import capacity
99 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
7 Nov 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Oldbury 132Kv

GSP view

5 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 192 MW: 93 MW connected, 99 MW accepted to connect.

  • Kelvin wayEnfinium kelvin limited, Bioenergy and wasteConnected45.78 MW
  • 6 union rdInnovative environmental solutions uk ltd, Bioenergy and wasteConnected35 MW
  • Oldbury stor, wolverhampton roadConrad (oldbury) limited, Gas and other fossil, Oldbury B 11Kv primaryConnected10.135 MW
  • Oldbury, po box 80Oldbury energy solutions (uk) ltd, Gas and other fossil, Birchfield Lane 132/11Kv primaryConnected1.5 MW
  • Dpd group uk limitedDpd group uk limited, Solar, Oldbury B 11Kv primaryConnected1 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose