Edgbaston, university of birmingham

University of birmingham at Kitwell 132Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
22 Jul 2016
Status
Connected
Customer
University of birmingham
Site name
Edgbaston, university of birmingham
Address
Maintenance Building, South West, Birmingham, Edgbaston, Birmingham, West Midlands, B15 2TT
Grid reference
Easting 404796, northing 283448
Licence area
West Midlands
Grid supply point
Kitwell 132Kv S Stn
Bulk supply point
Selly Oak 132 Transformer Site 132Kv S Stn
Primary substation
Selly Oak 132/11Kv
Connection voltage
132 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Gas turbine (OCGT): 2.14 MW registered
Energy source 2
Fossil - Gas, Gas turbine (OCGT): 1.19 MW registered
Energy source 3
1 MW registered
Registered capacity
4.959 MW
Maximum export capacity
13.3 MW
Maximum import capacity
28.5 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1430000001360/1430000001370
Import MPAN
1430000001342/1430000001351
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Kitwell 132Kv S Stn

GSP view

6 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 182 MW: 12 MW connected, 170 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?